Revolutionizing public

transport in the capital

Announcement of training schedule and training in Vietnam to operate the railway line 2A Cat Linh – Ha Dong

hinh anh dao tao minh hoa

Implementation of the training plan for personnel to operate and operate the 2A Cat Linh – Ha Dong route (according to Document No. 2432 / QĐĐDS-KTTĐ dated 20/10/2016 of Railway Transport Management Board – Ministry of Transport). Hanoi Railway One Member Limited Company announces the schedule of training courses and personnel training schedule for 2A Cat Linh – Ha Dong route in Vietnam as follows:

  1. Opening time: All trainees are awarded the first round, 2nd round, 3rd round of training in Vietnam. They will attend the opening ceremony at 8h00 on 13/11/2016 at the Railway College Hall – Address: No. 2, Lane 167 Gia Quat, Long Bien, Hanoi.
  2. Theoretical training time: It is organized in 3 stages, specifically as follows:
Stage Class Time enrollment Time to start training
Stage 1 Class 1: Moderation Center (20 people) 14h00 on 01/11/2016 From 02/11/2016 to 29/12/2016 (Electrical Coordinator staff only until 17/12/2016)
Stage 2 1.    Class 2: Passenger ships (38 people) 8h00 on 12/11/2016 From 14/11/2016 to 29/12/2016
2.  Class 3: Ship repair (20 people) 8h00 on 12/11/2016 From 14/11/2016 to 12/12/2016
3.    Class 4:

3.1.  Station 1 station (56 people): Head of  Station; Assistant; Administrative Manager; Staff General Operations.

3.2.   Station (61 people) including safety officer; Train operators; Passenger Manager Passenger; Service Sales Representative; Staff ticket collection manager

8h00 on 12/11/2016 From 14/11/2016 to 06/12/2016
4.    Class 5: Repair Signal Information (28 people) 8h00 on12/11/2016 From 14/11/2016 to 17/12/2016
5.    Class 6: Electrical repair (13 people) 8h00 on 12/11/2016 From 14/11/2016 to 17/12/2016
6.    Class 7: Repair terminal equipment (23 people) 8h00 on 12/11/2016 From 14/11/2016 to 29/12/2016
7.    Class 8: Rail repair (39 people) 8h00 on 12/11/2016 From 14/11/2016 to 17/12/2016
8.    Class 9: Repair works (22 people)

 

8h00 on 12/11/2016 From 14/11/2016 to 17/12/2016
Stage 3 1.   Station 3 stations (78 people), including: general manager.

2.    Station 4 station (72 people) including ticket staff; Chief of ca

13h30 on 06/12/2016 From 07/12/2016 to 29/12/2016


(Details of the theoretical training classes are attached)

  1. Practical training time: Organized training after installation, alignment equipment.
  2. Some notes for students.
  • Students enrolled, scheduled to teach and participate in training at the Railway College.
  • Non-resident cases must be submitted to the Company.
  • Student submits 4 4×6 photo cards, white background.

Any contact information, help (if needed): Administration – Organization, telephone number: 043 8553388, 046 2593897.

The company would like to announce!

HANOI STREET COMPANY LIMITED

Download: Notice of start and focus

Theo HMC admin