Revolutionizing public

transport in the capital

Announcement of recruitment: Extension of time for recruitment of candidates for the second phase of 2016

On 31/3/2016, Hanoi Railway One Member Limited Company has announced the 46 / TB-DDSHN on recruitment of human resources in the second phase in 2016 to train in Vietnam to operate and exploit the Route No. DBS 2A, Cat Linh – Ha Dong. In particular, the time of receiving applications for candidates from April 6, 2016 to May 24, 2016.

In order to create favorable conditions, applicants will have the opportunity to apply for recruitment as well as the second selection of human resources in 2016 to train in Vietnam to operate and operate the 2A Highway No. 2A. , Cat Linh – Ha Dong. Hanoi Railway One Member Limited Liability Company extends the time for receiving applications for the second vacancy in Vietnam until June 25, 2012 for the following positions:

Number Order Unit / Division Position
1 Passenger ship section Ship supervisor
Signal supervisor
Train the boat
Test drive, ship
2 Moderation department Train dispatcher
Cruise Control Officer
3 Inspection of carriage locomotives Coordinator and manager checks repairs
The operator checks and repairs the ship
Senior staff inspects electrical equipment on board
Employee inspects electrical equipment on board
Senior staff inspecting machinery equipment on board
Employee inspects machinery equipment on board
Electrical repair workers monthly
Employees repair equipment and machinery monthly
Number Order Unit / Division Position
 1 Inspection of carriage locomotives Operators of B gear unit (wheel locks)
Operators of B gear unit (wheel locks)
4 Signal inspection repair department Information repairer
Signal repairman
Auto Ticket Fitter Repairer (AFC)
5 Electrical repair inspection department Electrician
7 Rail inspection inspection department Head of department
Deputy Head of department
Test engineer measurement
Railroad maintenance man (including 3 employees looking for disabilities)
Railway management staff
8 Building inspection department Head of department
Deputy Head of Division
Electrical engineer
Repairers of works
9  Repair station equipment department General repair shop

– Time: 8:30 am – 11:30 am, from 14h00 to 16h30 (except Saturdays, Sundays and public holidays as prescribed).

– Location: Ha Noi Railways One Member Limited Company, Room 805 – 8th Floor, 315 Truong Chinh Building, Khuong Mai Ward, Thanh Xuan District, Hanoi.

Is pleased to announce ./.

[Announcement to extend the period of HS 2nd intake]

Theo HMC admin